CASE STUDIES

Holford Gas Storage Project 

Client: Jacobs Engineering (on behalf of E.on)

Date: 2008

Role: Gas Pipeline & Flow line Construction Management

Project Description: Design & construction of 11Km of 750mm &  300mm diameter high pressure steel gas pipelines as part of the underground natural gas storage facility in Cheshire. Work scope included pig trap facilities and gas marshalling area as well as cathodic protection systems. It also involved the installation of electrical and fibre optic cabling.

 

Portland Gas Storage Pipeline Tender

Client: PPS Pipeline Systems GmbH

Date: 2007

Role: Bid Management

Project Description: Preparation of tender proposals for the design, procurement, construction, testing and pre-commissioning of the Phase 1 Seawater Chamber and Intake/outfall pipelines including the Phase 2 Mappowder Above Ground Installation (AGI), 914mm (36”) diameter welded steel gas pipeline, Osmington Block Valve Station and the 762mm (30”) diameter brine pipeline. This included the collaboration with a joint venture partner for the offshore pipeline installation.

 

Matching Green LTS Reinforcement Project

Client: Fastflow Pipeline Services Ltd

Date: 2011

Role: Operations Director/Project Management

Project Description: Construction of the new Phase 2 Above Ground Installation (AGI) high pressure offtake facility. Work scope included the installation of filters, metering, gas preheat & pressure reduction equipment to increase gas line pack storage capacity in the local transmission system for National Grid.